KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  3-15-2010
Number of Hours:  2.00
Manual Reference:  Page 6-2
Brief Description:  Drilling the 404 and 405

HS-404 and 405 flutted and deburred. Aft flange of 405 clecoed to HS-603 and drilled. HS-405 drilled unsing HS-801 as a guide. HS-801 drilled to HS-702. HS-810 and 814 clecoed to HS-702.

HS-404 drilled to 405.

Wa concerned about the edge distance here. Sent a picture to Van's and they said it's good and to build on.

Final match drilled the 801 to the ribs and spars.
' style=





' style=




' style=

Van's says to build on

Van's says to build on

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.